Polski

Article · Solution Architect – role and craft · DDD Strategic Design

Governance and reviews: how to defend a design in front of the Architecture Review Board

Team design reviews, the Architecture Review Board and how to prepare and defend a solution (checklist, decision brief, typical questions from security, infrastructure and enterprise architecture), reference architecture and automatically checked standards, code review of the key places, communicating at different levels of detail, and conflicts and deadline pressure in realistic scenes.

By · · 16 min read

Thursday, 10 a.m. Ola has 25 minutes at the Architecture Review Board. Around the table sit an enterprise architect, the head of security, an infrastructure representative, the data protection officer and two domain architects. On the screen is the OrderFlow HLD after three iterations with the teams. In half an hour Ola will leave with an approval, a conditional approval or a list of tasks for next month. What she leaves with was mostly decided over the last two weeks – outside the room.

4
C4 model levels – Context, Container, Component, Code – a ready-made scale of detail for different audiences
4
Technology Radar rings – Adopt, Trial, Assess, Hold – the Thoughtworks format since 2010
2018
"Accelerate" – approval of changes by an external body didn't reduce the change failure rate, but it did slow delivery down

Three levels of review

The most common governance mistake is one level for everything. Either every change waits for the monthly ARB, or nothing ever gets there because it's "a waste of time". Ola works with a pyramid:

Diagram: The governance pyramid: most decisions are made in the team, only high-impact ones reach the ARB
LevelWhoWhat it decidesArtefact
Team design reviewthe team, tech lead, SAcomponent design, contracts, error handlingLLD, team ADR
Architecture forumSAs and tech leads from several teamsshared components, cross-domain integrationscross-cutting ADR
ARBenterprise architecture, security, infrastructure, DPOHLDs of large initiatives, new technologies, exceptions to standardsdecision brief, minutes with conditions

It's worth writing the escalation criteria down rather than leaving them to intuition: "a new technology not on the radar", "personal data from more than one domain", "cost above X a year", "a new external vendor". That way a team knows when it doesn't have to wait for the ARB.

The team design review

A good team review isn't a presentation – it's work on a document. Ola sends the draft two days in advance and collects comments asynchronously. The meeting is only for what can't be settled in writing:

  • 10 minutes – context and the questions we're trying to answer,
  • 30 minutes – discussion of options and risks,
  • 5 minutes – the decision, open points with owners, ADR update.

The questions Ola asks at every review:

  • Are the problem and the NFRs written down as numbers?
  • Which options did we consider and why did we reject the others?
  • What happens when a dependency doesn't respond, or responds after 30 seconds?
  • Who owns the data and where do its copies come from?
  • Is the contract change backwards compatible?
  • How do we secure it and how do we monitor it?
  • How do we deploy, and how do we roll back?
  • What does it cost at ten times the traffic?

One rule saves the atmosphere: we review the design, not the author. The reviewer asks and suggests; within its own component, the team decides.

Architecture Review Board: preparation and defence

The ARB isn't an exam where you have to surprise the panel. Its members are responsible for the whole organisation's risks, and your job is to show that you know these risks and manage them. Ola's preparation plan:

  1. T − 3 weeks Submission and reconnaissance – Check the criteria and book a slot. Read the minutes of recent sessions – every member has favourite questions.
  2. T − 2 weeks 1:1 conversations – Show the draft to security, infrastructure, enterprise architecture and the DPO. Collect objections, fix the design or prepare answers.
  3. T − 1 week Materials – A one-page decision brief, the HLD, ADRs, the threat model and the estimate – at least 5 working days before the session.
  4. T − 2 days Rehearsal – A 10-minute presentation to a colleague playing the toughest reviewer.
  5. T The session – 10 minutes of presentation, the rest is questions. Write conditions down verbatim and confirm on the spot how you understand them.
  6. T + 2 days Wrap-up – Turn conditions into tasks with deadlines, update the ADRs, tell the teams about the decision.

The heart of the materials is the decision brief: one page that says what you're asking for, what the options were, what deviates from the standard and which risks remain. The HLD is an attachment for the curious.

arb/2026-12-orderflow-decision-brief.md
# ARB decision brief: Bazario – OrderFlow

**Author:** Ola Nowak (Solution Architect) · **ARB:** 2026-12-10 · **Status:** for decision
**Ask:** approve the target architecture + an exception to the standard (SaaS product search)

## 1. Context (3 sentences)
Today orders run on the old shop platform: up to a minute to confirm during promotions, hourly stock from the ERP.
Goal: OrderFlow – confirmation in < 2 s, no overselling, MVP launch in Q2.
Constraints: GDPR, PCI DSS (card data only at the payment operator), no warehouse system changes this year.

## 2. Options considered
| Option                           | For                         | Against                          | 3-yr TCO   |
|----------------------------------|-----------------------------|----------------------------------|------------|
| A. Extend the shop platform      | known system, quick start   | slow at peak, lock-in            | PLN 3.4M   |
| B. New OrderFlow (REC.)          | modular monolith, scale     | a new system to maintain         | PLN 3.1M   |
| C. SaaS OMS platform             | fastest rollout             | data at vendor, growing licence  | PLN 3.9M   |

## 3. Compliance with standards
- Compliant: Java 21 + Spring Boot, PostgreSQL, Kafka, OIDC (Keycloak), OpenTelemetry.
- Exception: SaaS product search (ADR-009). Owner: catalogue PO. Review: 2027-12.

## 4. NFRs and how we meet them
- 10k orders/day, up to 400/min on Black Friday → autoscaling 3–15 instances.
- Confirmation p95 < 2 s → asynchronous warehouse reservation, 1.5 s timeout to the payment operator.
- Availability 99.9%, RTO 30 min, RPO 5 min → warm standby in a second region, tested twice a year.

## 5. Security and data
- Personal data: addresses, phone numbers, order history. Column encryption, log masking.
- STRIDE threat model: 14 threats, 12 addressed, 2 open (owners, deadlines).

## 6. Risks and open questions (top 3)
1. `stock-levels` events from the WMS only from 15 Jan – plan B: stock sync every 5 min.
2. SaaS search above 30M queries/month – cost review (ADR-009).
3. DPO approval for data processing by the SaaS vendor – meeting on 2026-12-03.

## Attachments
HLD v0.4 · ADR-0011 and related · threat model · PERT estimate · TCO

Questions that will definitely come up

Who asksQuestionWhat they want to hear
SecurityWhat data do you process and how did you classify it?classification, minimisation, where it's stored, who has access
SecurityWhere is the threat model?STRIDE for the key flows, open risks with owners
SecurityHow do services authenticate to each other?workload identity or mTLS, short-lived tokens, no shared passwords
Infrastructure and SREWhat are the SLOs, RTO and RPO, and how will you test them?numbers, the DR strategy and the date of the first test
Infrastructure and SREWhat does it cost per month and how does it grow with traffic?capacity planning, unit cost, autoscaling
Infrastructure and SREWho is on call and where are the runbooks?the team, the rota, alerts linked to runbooks
Enterprise architectureWhy didn't you use the existing platform?a comparison in an ADR against explicit criteria
Enterprise architectureWho owns the customer data?the source system, the context map, how it's synchronised
DPO and complianceLegal basis, retention, right to erasure?GDPR compliance, retention periods, a data deletion process
DPO and complianceDoes the SaaS vendor have a data processing agreement, and where does it store data?a processing agreement (GDPR Art. 28), data located in the EU, a risk assessment, an exit strategy

The rest of this article is for members

Create a free account or sign in to read it all. Still ahead:

  • Reference architecture and standards
  • Code review of the key places
  • One design, different levels of detail
  • Conflicts and deadline pressure: four scenes
  • "Let's cut monitoring, we won't make it"
  • Security blocks a week before launch
  • Two teams fight over customer data
  • A senior pushes a favourite technology
  • Check yourself
  • Related topics