{"id":"6b09a4b9ff996234422a26ec","slug":"sa-estimation-cost-tco","title":"Estimation, cost and TCO: what it costs and how many servers you really need","summary":"A Solution Architect's number-crunching toolkit: high-level estimates (T-shirt sizing and PERT), stages and MVP, step-by-step capacity planning from traffic to instances and database, a 3-year build-vs-buy TCO, and technical debt translated into money. With a calculator in Python and TypeScript.","servedLang":"en","availableLangs":["pl","en"],"topics":["solution-architecture","microservices","monolith"],"techs":["python","typescript"],"tags":["solution-architect","estimation","pert","t-shirt-sizing","mvp","capacity-planning","tco","build-vs-buy","technical-debt","finops"],"level":"intermediate","kind":"article","access":"members","status":"published","cover":null,"author":{"id":"6b08bd2e80884893657cc8cf","name":"Redakcja Art of Devs","avatar":null,"handle":"redakcja","community":false},"readingMinutes":17,"stats":{"views":1,"likes":0,"bookmarks":0,"comments":0},"publishedAt":"2026-11-27T15:41:45.650Z","updatedAt":"2026-11-27T17:32:33.389Z","requestedLang":"en","theme":{"hero":"classic","heroMedia":null,"accent":"teal","background":"grid","weaveResources":true,"toc":"right"},"seoDescription":"IT project estimation for architects: cone of uncertainty, T-shirt sizing, PERT (O + 4M + P) / 6, MVP and walking skeleton, capacity planning (RPS, instances, DB QPS, disk), 3-year build vs buy TCO, cost of delay, technical debt as a cost.","wordCount":3337,"doc":{"type":"doc","content":[{"type":"paragraph","content":[{"type":"text","text":"A steering committee, fifteen minutes on the item \"Bazario – OrderFlow, budget\". The sponsor looks at Ola and asks the two questions a Solution Architect hears more often than any other: \"How much will it cost?\" and \"When will it be ready?\". He wants one number. Ola answers with a range, shows where it comes from, and says what would have to happen to narrow it. This article is about how to arrive at such an answer – and how to defend it."}]},{"type":"callout","attrs":{"variant":"tip","title":"In short"},"content":[{"type":"bulletList","content":[{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"An estimate at the HLD stage is a "},{"type":"text","text":"range with assumptions","marks":[{"type":"bold"}]},{"type":"text","text":", not a promise. T-shirt sizing gives you the scale, PERT gives you the expected value and the uncertainty, and splitting the work into stages with an MVP lets you start before everything is known."}]}]},{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"Capacity planning","marks":[{"type":"bold"}]},{"type":"text","text":" is a chain of simple multiplications: traffic → requests per second → peak → instances → database → disk. You write each link down as an assumption and verify it with a load test."}]}]},{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"TCO","marks":[{"type":"bold"}]},{"type":"text","text":" is counted in years, not months: people, infrastructure, licences, maintenance and the cost of exit. Technical debt is a cost too – you pay interest on it with every change."}]}]}]}]},{"type":"stats","attrs":{"items":[{"value":"86,400","label":"seconds in a day","hint":"1 million requests a day is only about 11.6 RPS on average – but nobody designs for the average"},{"value":"0.25×–4×","label":"estimate spread at the concept stage","hint":"according to Boehm and McConnell's \"cone of uncertainty\""},{"value":"33%","label":"of developers' time","hint":"goes to technical debt and bad code (Stripe, *The Developer Coefficient*, 2018)"}]}},{"type":"heading","attrs":{"level":2,"id":"why-a-range-and-not-a-number"},"content":[{"type":"text","text":"Why a range and not a number"}]},{"type":"paragraph","content":[{"type":"text","text":"At the start of a project you don't yet know what you don't know. Barry Boehm showed, and Steve McConnell popularised in "},{"type":"text","text":"Software Estimation","marks":[{"type":"italic"}]},{"type":"text","text":" (2006) as the "},{"type":"text","text":"cone of uncertainty","marks":[{"type":"bold"}]},{"type":"text","text":", that the spread of an estimate only shrinks as decisions get made. At the concept stage the real cost can be anywhere from a quarter to four times the first estimate."}]},{"type":"chart","attrs":{"type":"line","title":"The cone of uncertainty: how wrong an estimate can be at each stage","caption":"Model multipliers after Boehm and McConnell (Software Estimation, 2006), not a measurement of a specific project. The cone only narrows when you make decisions – the passage of time alone doesn't narrow it.","unit":"× initial estimate","data":{"labels":["Initial concept","Approved product definition","Requirements complete","UI design complete","Detailed design complete","Software complete"],"series":[{"name":"Upper bound","values":[4,2,1.5,1.25,1.1,1]},{"name":"Lower bound","values":[0.25,0.5,0.67,0.8,0.9,1]}]}}},{"type":"paragraph","content":[{"type":"text","text":"Practical takeaways for an architect:"}]},{"type":"bulletList","content":[{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"Give the estimate together with the "},{"type":"text","text":"stage","marks":[{"type":"bold"}]},{"type":"text","text":" it was made at and a list of "},{"type":"text","text":"assumptions","marks":[{"type":"bold"}]},{"type":"text","text":". When an assumption breaks, the estimate is void – and everyone knows it."}]}]},{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"Plan a "},{"type":"text","text":"re-estimate","marks":[{"type":"bold"}]},{"type":"text","text":" after every milestone that narrows the cone: after requirements workshops, after the HLD, after a PoC."}]}]},{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"Turn risky assumptions into knowledge as early as possible: a spike, a PoC, a conversation with the team you depend on."}]}]}]},{"type":"heading","attrs":{"level":2,"id":"high-level-estimates-t-shirts-and-pert"},"content":[{"type":"text","text":"High-level estimates: T-shirts and PERT"}]},{"type":"heading","attrs":{"level":3,"id":"t-shirt-sizing-scale-instead-of-a-number"},"content":[{"type":"text","text":"T-shirt sizing – scale instead of a number"}]},{"type":"paragraph","content":[{"type":"text","text":"When all you have is a list of epics, counting hours makes no sense. The team assigns sizes, and the architect makes sure an XL never enters the plan without being broken down:"}]},{"type":"table","content":[{"type":"tableRow","content":[{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Size"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Person-days"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Bazario example"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"XS"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"up to 3"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"a new field on the address form with validation"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"S"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"3–10"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"integration with a parcel locker network through an existing API"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"M"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"10–25"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"a support panel for returns and complaints"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"L"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"25–60"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"a promotion engine with rule versioning"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"XL"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"over 60"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"\"migrate the product catalogue from the old system\" – must be broken down"}]}]}]}]},{"type":"heading","attrs":{"level":3,"id":"pert-three-numbers-instead-of-one"},"content":[{"type":"text","text":"PERT – three numbers instead of one"}]},{"type":"paragraph","content":[{"type":"text","text":"For packages that go into the plan, Ola asks for three values: optimistic (O), most likely (M) and pessimistic (P). The "},{"type":"text","text":"PERT","marks":[{"type":"bold"}]},{"type":"text","text":" method (developed in 1958 for the US Navy's Polaris missile programme) turns them into an expected value and a deviation:"}]},{"type":"paragraph","content":[{"type":"text","text":"E = (O + 4M + P) / 6","marks":[{"type":"bold"}]},{"type":"text","text":"  "},{"type":"text","text":"σ = (P − O) / 6","marks":[{"type":"bold"}]}]},{"type":"table","content":[{"type":"tableRow","content":[{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Package"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"O"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"M"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"P"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"E"}]}]},{"type":"tableHeader","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"σ"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Payment operator integration"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"5"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"8"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"17"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"9.0"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"2.0"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Promotion and discount rules"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"8"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"12"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"22"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"13.0"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"2.3"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Support panel (returns)"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"6"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"10"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"20"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"11.0"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"2.3"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Migrate catalogue and price lists"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"3"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"6"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"15"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"7.0"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"2.0"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Load tests and hardening"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"4"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"5"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"9"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"5.5"}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"0.8"}]}]}]},{"type":"tableRow","content":[{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"Total","marks":[{"type":"bold"}]}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph"}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"41","marks":[{"type":"bold"}]}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph"}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"45.5","marks":[{"type":"bold"}]}]}]},{"type":"tableCell","attrs":{"colspan":1,"rowspan":1},"content":[{"type":"paragraph","content":[{"type":"text","text":"4.4","marks":[{"type":"bold"}]}]}]}]}]},{"type":"paragraph","content":[{"type":"text","text":"Expected values add up, deviations don't: the total σ is the square root of the sum of squares (√19.6 ≈ 4.4). The table teaches three lessons:"}]},{"type":"orderedList","attrs":{"start":1},"content":[{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"The sum of the \"most likely\" values (41 person-days) understates the result.","marks":[{"type":"bold"}]},{"type":"text","text":" The distributions are right-skewed – things go worse more often than better – so E comes out higher (45.5)."}]}]},{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"The plan gets a percentile, not the mean.","marks":[{"type":"bold"}]},{"type":"text","text":" E + 1.65σ ≈ 53 person-days gives about a 95% chance of fitting (assuming a roughly normal distribution)."}]}]},{"type":"listItem","content":[{"type":"paragraph","content":[{"type":"text","text":"The biggest risk is visible at once","marks":[{"type":"bold"}]},{"type":"text","text":": packages with a large σ are candidates for a spike before the start."}]}]}]},{"type":"paragraph","content":[{"type":"text","text":"Ola keeps the estimate next to the HLD as a file in the repository – with the assumptions, exclusions and risks that would void it:"}]},{"type":"codeBlock","attrs":{"language":"yaml","filename":"docs/estimate-orderflow-mvp.yaml"},"content":[{"type":"text","text":"# High-level estimate – lives next to the HLD and is versioned like code.\ninitiative: Bazario OrderFlow MVP – new order system, card and BLIK payments via one operator\nestimated_by: [ola.nowak, orderflow-tech-lead, warehouse-tech-lead]\ndate: 2026-11-27\nstage: requirements-complete        # where we are on the cone of uncertainty\nunit: person-days\n\nassumptions:                        # if one of them breaks, the estimate is void\n  - Payment operator sandbox available from week 2\n  - The WMS publishes stock-levels events (AsyncAPI) from 15 January\n  - Polish market only, PLN only, consumer customers only\nexclusions:\n  - Mobile app changes (separate team, separate estimate)\n  - Migration of orders older than 2 years\n\nwork_packages:                      # PERT: E = (O + 4M + P) / 6, sigma = (P - O) / 6\n  - { name: Payment operator integration,      size: S, o: 5, m: 8,  p: 17 }\n  - { name: Promotion and discount rules,      size: M, o: 8, m: 12, p: 22 }\n  - { name: Support panel (returns, refunds),  size: M, o: 6, m: 10, p: 20 }\n  - { name: Migrate catalogue and price lists, size: S, o: 3, m: 6,  p: 15 }\n  - { name: Load tests and hardening,          size: S, o: 4, m: 5,  p: 9 }\n\nresult:\n  sum_of_most_likely: 41            # what a single-point estimate would say\n  pert_expected: 45.5\n  pert_sigma: 4.4                   # square root of the sum of squared sigmas\n  p95: 53                           # E + 1.65 sigma – the number that goes into the plan\n\nrisks:\n  - { risk: Payment operator API slower than documented, impact: +5 pd, owner: orderflow-tech-lead }\n  - { risk: Legal changes the Omnibus price-history display, impact: +3 pd, owner: orderflow-po }"}]},{"type":"callout","attrs":{"variant":"warning","title":"Common mistake: the hallway estimate"},"content":[{"type":"paragraph","content":[{"type":"text","text":"\"Roughly, how long will it take?\" – \"Well, about three months.\" Two weeks later \"three months\" is in a deck for the board, and a month after that – in the Black Friday marketing campaign plan. A number given without assumptions and without a stage becomes a commitment. If you have to answer on the spot, give a range and a condition: \"two to five months; I'll narrow it after next week's workshop with the fulfilment team\"."}]}]}]},"toc":[{"id":"why-a-range-and-not-a-number","text":"Why a range and not a number","level":2,"locked":false},{"id":"high-level-estimates-t-shirts-and-pert","text":"High-level estimates: T-shirts and PERT","level":2,"locked":false},{"id":"t-shirt-sizing-scale-instead-of-a-number","text":"T-shirt sizing – scale instead of a number","level":3,"locked":false},{"id":"pert-three-numbers-instead-of-one","text":"PERT – three numbers instead of one","level":3,"locked":false},{"id":"stages-and-mvp-how-to-start-before-everything-is-known","text":"Stages and MVP: how to start before everything is known","level":2,"locked":true},{"id":"capacity-planning-step-by-step","text":"Capacity planning step by step","level":2,"locked":true},{"id":"what-goes-into-tco","text":"What goes into TCO","level":2,"locked":true},{"id":"3-year-tco-build-or-buy","text":"3-year TCO: build or buy?","level":2,"locked":true},{"id":"technical-debt-as-a-cost","text":"Technical debt as a cost","level":2,"locked":true},{"id":"check-yourself","text":"Check yourself","level":2,"locked":true},{"id":"related-topics","text":"Related topics","level":2,"locked":true}],"locked":true,"paywall":null,"previewRatio":0.3,"totalBlocks":56,"visibleBlocks":21,"resources":[{"id":"6b0857c53c96f2d34d0b4828","type":"video","provider":"youtube","url":"https://www.youtube.com/watch?v=UC5xf8FbdJc","embedUrl":"https://www.youtube-nocookie.com/embed/UC5xf8FbdJc","title":"Back-Of-The-Envelope Estimation / Capacity Planning","description":"Weekly system design newsletter: https://bit.ly/3tfAlYD Checkout our bestselling System Design Interview books: Volume 1: https://amzn.to/3Ou7gkd Volume 2: https://amzn.to/3HqGozy Other things we made: Digital version of System Design Interview books: https://bit.ly/3mlDSk9 Twitter…","author":"ByteByteGo","thumbnailUrl":"https://i.ytimg.com/vi/UC5xf8FbdJc/hqdefault.jpg","durationSec":null,"lang":"en","topics":[],"techs":["general"],"tags":["system-design"],"price":"free","featured":false,"featuredOrder":0,"packageName":null,"source":"youtube-rss","publishedAt":"2022-09-13T16:44:32.000Z","popularity":77,"verifiedAt":"2026-11-26T10:55:08.000Z","curated":false,"addedBy":"6b0857a15a2625e44ecaabe6","createdAt":"2026-11-26T16:01:07.480Z","updatedAt":"2026-11-26T16:01:07.480Z"},{"id":"6b0857be3c96f2d34d0b41fd","type":"article","provider":"web","url":"https://martinfowler.com/bliki/TechnicalDebtQuadrant.html","embedUrl":null,"title":"bliki: Technical Debt Quadrant","description":"People argue about whether some kinds of bad code count as Technical Debt. I prefer to focus on the interest/principal decision, and recognize debt has different causes.","author":"Martin Fowler","thumbnailUrl":"https://martinfowler.com/bliki/images/techDebtQuadrant.png","durationSec":null,"lang":"en","topics":[],"techs":["general"],"tags":["martin-fowler"],"price":"free","featured":false,"featuredOrder":0,"packageName":null,"source":"manual","publishedAt":null,"popularity":75,"verifiedAt":"2026-11-26T11:07:14.000Z","curated":false,"addedBy":"6b0857a15a2625e44ecaabe6","createdAt":"2026-11-26T16:00:59.965Z","updatedAt":"2026-11-26T16:00:59.965Z"},{"id":"6b0857be3c96f2d34d0b4212","type":"article","provider":"web","url":"https://martinfowler.com/articles/is-quality-worth-cost.html","embedUrl":null,"title":"Is High Quality Software Worth the Cost?","description":"We usually perceive that it costs more to get higher quality, but software internal quality actually reduces costs.","author":"Martin Fowler","thumbnailUrl":"https://martinfowler.com/articles/is-quality-worth-cost/card.png","durationSec":null,"lang":"en","topics":[],"techs":["general"],"tags":["martin-fowler"],"price":"free","featured":false,"featuredOrder":0,"packageName":null,"source":"manual","publishedAt":null,"popularity":75,"verifiedAt":"2026-11-26T11:07:16.000Z","curated":false,"addedBy":"6b0857a15a2625e44ecaabe6","createdAt":"2026-11-26T16:00:59.965Z","updatedAt":"2026-11-26T16:00:59.965Z"},{"id":"6b0857c33c96f2d34d0b4654","type":"book","provider":"openlibrary","url":"https://openlibrary.org/works/OL3510570W","embedUrl":null,"title":"The Mythical Man-Month: Essays on Software Engineering","description":"","author":"Frederick P. Brooks","thumbnailUrl":"https://covers.openlibrary.org/b/id/6915361-L.jpg","durationSec":null,"lang":"en","topics":[],"techs":["general"],"tags":["book"],"price":"paid","featured":false,"featuredOrder":0,"packageName":null,"source":"openlibrary","publishedAt":"1974-01-01T00:00:00.000Z","popularity":73,"verifiedAt":"2026-11-26T11:00:08.000Z","curated":false,"addedBy":"6b0857a15a2625e44ecaabe6","createdAt":"2026-11-26T16:01:04.995Z","updatedAt":"2026-11-26T16:01:04.995Z"},{"id":"6b0857b43c96f2d34d0b3854","type":"article","provider":"web","url":"https://robertovitillo.com/costs-of-microservices","embedUrl":null,"title":"The costs of microservices (2020)","description":"An application typically starts its life as a monolith. Take a modern backend of a single-page Javascript application, for example - it starts out as a single stateless web service that exposes a RESTful HTTP API and uses a relational database as a backing store. The service is composed of a…","author":"Roberto's blog","thumbnailUrl":null,"durationSec":null,"lang":"en","topics":["microservices"],"techs":["javascript"],"tags":["databases","software-architecture","hacker-news"],"price":"free","featured":false,"featuredOrder":0,"packageName":null,"source":"hn","publishedAt":"2023-10-30T14:33:41.000Z","popularity":76,"verifiedAt":"2026-11-26T11:07:56.000Z","curated":false,"addedBy":"6b0857a15a2625e44ecaabe6","createdAt":"2026-11-26T16:00:51.221Z","updatedAt":"2026-11-26T16:00:51.221Z"},{"id":"6b0857bf3c96f2d34d0b42b9","type":"article","provider":"web","url":"https://learn.microsoft.com/en-us/azure/well-architected","embedUrl":null,"title":"Azure Well-Architected Framework - Microsoft Azure Well-Architected Framework","description":"Azure Well-Architected Framework is a set of quality-driven tenets, architectural decision points, and review tools that help solution architects build a technical foundation for their workloads.","author":"Microsoft Azure Well-Architected Framework","thumbnailUrl":"https://learn.microsoft.com/en-us/media/open-graph-image.png","durationSec":null,"lang":"en","topics":[],"techs":["general"],"tags":["cloud"],"price":"free","featured":false,"featuredOrder":0,"packageName":null,"source":"manual","publishedAt":null,"popularity":60,"verifiedAt":"2026-11-26T11:26:15.000Z","curated":false,"addedBy":"6b0857a15a2625e44ecaabe6","createdAt":"2026-11-26T16:01:02.417Z","updatedAt":"2026-11-26T16:01:02.417Z"}],"challenges":[{"id":"6b093dc291bd8fbaf2a0c8d8","slug":"payment-circuit-breaker","title":"Circuit breaker for a payment gateway","summary":"A circuit breaker with closed, open and half-open states, an injected clock, a trial-success threshold and a business-error filter – so a payment gateway outage does not take the whole shop down.","servedLang":"en","availableLangs":["pl","en"],"kind":"code","category":"architecture","status":"published","difficulty":"hard","topics":["circuit-breaker","microservices"],"techs":["typescript","javascript","python","dotnet","java","go"],"tags":["circuit-breaker","resilience","fault-tolerance","state-machine","payments"],"languages":["typescript","javascript","python","csharp","java","go"],"questionCount":null,"xp":40,"stats":{"attempts":0,"solves":0,"solutions":0,"comments":0},"solveRate":null,"publishedAt":"2026-11-27T08:22:26.251Z"}],"attachments":[],"hasCode":true,"repoUrl":null,"series":[{"slug":"solution-architect-path","title":"How to become a Solution Architect","items":[{"slug":"solution-architecture","title":"Who is a Solution Architect? The role, its responsibilities and the career map","current":false},{"slug":"sa-daily-duties","title":"A day in the life of a Solution Architect: duties, rhythm and priorities","current":false},{"slug":"sa-requirements-and-nfr","title":"Requirements and NFRs: getting the numbers out of the business that actually shape the system","current":false},{"slug":"sa-hld-step-by-step","title":"HLD step by step: from a blank page to an approved architecture","current":false},{"slug":"hld-complete-example","title":"A complete HLD by example: the VoltGo charging network – document, diagrams, ADRs and tools","current":false},{"slug":"poc-guide","title":"PoC, spike, prototype, MVP – how to plan and run a PoC (with a working example)","current":false},{"slug":"sa-decisions-and-adr","title":"Architecture decisions and ADRs: how to choose, weigh trade-offs and record the “why”","current":false},{"slug":"sa-integrations-and-contracts","title":"Integrations and contracts: APIs, events and cross-team dependencies without surprises","current":false},{"slug":"sa-security-and-operations","title":"Security and operations in the design: STRIDE, OAuth2, SLOs and runbooks","current":false},{"slug":"sa-estimation-cost-tco","title":"Estimation, cost and TCO: what it costs and how many servers you really need","current":true},{"slug":"sa-governance-and-reviews","title":"Governance and reviews: how to defend a design in front of the Architecture Review Board","current":false},{"slug":"sa-migrations-as-is-to-be","title":"AS-IS → TO-BE migration without downtime: transitional architecture, strangler fig and CDC","current":false},{"slug":"sa-how-to-become","title":"How to become a Solution Architect: skills, path, interview and the first 90 days","current":false}]}],"prev":{"slug":"sa-security-and-operations","title":"Security and operations in the design: STRIDE, OAuth2, SLOs and runbooks"},"next":{"slug":"sa-governance-and-reviews","title":"Governance and reviews: how to defend a design in front of the Architecture Review Board"},"featured":false,"authorCard":{"id":"6b08bd2e80884893657cc8cf","name":"Redakcja Art of Devs","avatar":null,"handle":"redakcja","headline":"Wzorce projektowe · Architektura · AI i LLM","community":false,"reputation":{"points":3900,"level":{"key":"mentor","label":"Mentor"}},"articles":104,"skills":[{"key":"typescript","title":"TypeScript","level":5,"levelLabel":"Authority","articles":90},{"key":"dotnet","title":".NET","level":5,"levelLabel":"Authority","articles":61},{"key":"python","title":"Python","level":5,"levelLabel":"Authority","articles":59},{"key":"java","title":"Java","level":5,"levelLabel":"Authority","articles":46}]}}